
Jio Beat Planner Workforce Management
Jio Beat Planner is a free business app by Reliance Jio Infocomm that lets teams record visit check-ins and attendance.
Jio Beat Planner is a free Business app from Reliance Jio Infocomm, first released on September 20, 2021 and updated to version 5.1.6 on June 30, 2026. The download is 83 MB, runs on Android 7.0 and above, and shows no ads or in-app purchases.
Screen gallery








Jio Beat Planner is a productivity application by Reliance Jio Infocomm that assists managers and field subordinates in planning, executing, and monitoring daily field visits, also known as beats. The app is designed to streamline workforce management (SnD) tasks, enabling users to mark their presence at assigned points of business through check-in and check-out actions. It serves as a centralized tool for viewing scheduled, completed, and upcoming beats, as well as for handling unplanned visits by allowing self-reporting. The application is primarily aimed at organizations that require structured field operations, such as sales teams, service engineers, and other personnel who need to track their daily routes and activities.
Beyond basic visit tracking, Jio Beat Planner incorporates features for attendance management, real-time location sharing, and data collection during field visits. Managers can approve subordinate attendance, view their real-time locations, and access information about engineers' availability and slots. The app also supports capturing photos at visited business points, submitting local conveyance claims with approval status tracking, and accessing learning management system content. Additionally, it includes a symptom checker for on-roll employees, which may be used for health-related self-assessments.
With a file size of 83 MB and a minimum operating system requirement of Android 7.0, Jio Beat Planner is designed to be installed on a wide range of Android devices. It is available for free without any in-app purchases or advertisements, making it a practical option for organizations looking to deploy a field workforce management solution without additional costs. The app's permissions include access to location, phone, photos/media/files, storage, camera, Wi-Fi connection information, and device ID & call information, which are necessary for its core functions such as check-in, photo capture, and location tracking.
Key features
- Mark visits by check-in/checkout at assigned points of business
- View today’s, future’s, scheduled, and completed beats
- Self report-in for unplanned visits
- Capture photos of the point of business visited
- Check self attendance and approve subordinates' attendance
- Get real-time location of subordinates
- Report and collect data during visits to assigned points of business
- Apply for local conveyance claim and check approval status
- View learning management system content
- View engineer’s location and available slots
How to install
- Tap the download button on this page to begin downloading the APK file (83 MB).
- When your Android device prompts, allow your browser or file manager to install apps by enabling the 'Install unknown apps' setting.
- Once the download is complete, open the downloaded APK file from your notification or file manager.
- Tap 'Install' and follow any on-screen instructions. The app requires Android 7.0 or higher.
- After installation, open the Jio Beat Planner app from your app drawer and sign in with your credentials.
Pros
- Comprehensive beat planning and tracking
- Real-time location sharing for better oversight
- Includes attendance and claim management features
- Free to use with no ads or in-app purchases
- Regular updates as indicated by version history
Cons
- Requires numerous permissions (location, camera, files, etc.)
- May be heavy at 83 MB for some devices
- Designed specifically for workforce management, not general use
Version history
| Version | Size | Requires Android | Updated |
|---|---|---|---|
| 5.1.6 | 83 MB | 7.0 | Jun 30, 2026 |
| 5.1.3 | 96 MB | 7.0 | Jun 16, 2026 |
| 5.1.5 | 96 MB | 7.0 | Apr 30, 2026 |
| 3.4.0 | 35 MB | 5.0 | Dec 21, 2025 |
Jio Beat Planner is intended for managers and field subordinates within organizations that require structured beat or visit planning and tracking, such as sales teams, service engineers, and other mobile workforces.
Ensure that location services are enabled on your device for accurate check-in and real-time tracking. Also, grant necessary permissions during setup to avoid interruptions when using camera or file features.
Permissions
Frequently asked questions
What is Jio Beat Planner used for?
It is a workforce management tool built around beat planning. Managers and their subordinates can check in and check out to mark visits, view today's, future, scheduled and completed beats, and report in themselves when heading out for an unplanned visit.
Can I record proof of a visit inside the app?
Yes. The app lets you capture photos of the point of business you visit, and it also supports reporting and collecting data during visits to an assigned point of business.
Does the app handle attendance and location tracking?
It does both. You can check your own attendance and approve the attendance of your subordinates, and the app provides the real-time location of subordinates as well as an engineer's location and available slots.
Are conveyance claims and training content part of the app?
Yes. You can apply for a local conveyance claim and check its approval status, and you can view content from a learning management system. On-roll employees can also fill in a symptom checker.
What are the app's size, price, and update details?
Jio Beat Planner is a free Business app from Reliance Jio Infocomm, rated for Everyone, with no ads and no in-app purchases. It is 83 MB, requires Android 7.0 or later, was released on 2021-09-20, and its most recent version 5.1.6 arrived on 2026-06-30. It has been installed more than 1,000,000 times.
Jio Beat Planner offers a robust set of tools for managing field visits, attendance, and related workflows. Its free availability and comprehensive features make it a valuable asset for businesses looking to optimize their field operations.
Similar apps
Updated: Oct 24, 2026
| Version | Size | Requires Android | Updated |
|---|---|---|---|
| 5.1.6 | 83 MB | 7.0 | Jun 30, 2026 |
| 5.1.3 | 96 MB | 7.0 | Jun 16, 2026 |
| 5.1.5 | 96 MB | 7.0 | Apr 30, 2026 |
| 3.4.0 | 35 MB | 5.0 | Dec 21, 2025 |
- Size
- 83 MB
- Requires Android
- 7.0
- Updated
- Jun 30, 2026
- Installs
- 1M+
- Category
- Productivity
- Developer
- Reliance Jio Infocomm
- Content rating
- Everyone
- Package
- reliance.jiobeatplannerx
- Free
- ✓



